Second Manapouri Tailrace Tunnel
Hydro Tunnels
Enlargement of the existing Powerplant with a 9.6 km long TBM-tunnel with a diameter of 10.05 metres. The project consists of furhter three shafts, several exittunnels and various underground works.
Toggle navigation
STRABAG AUSTRALIA
ACTIVITIES
Overview
Civil Engineering
Dams
Hydroelectric Power Plants
Harbour Facilities
Water Technologies
Civil Engineering
Dams
Hydroelectric Power Plants
Harbour Facilities
Water Technologies
Transportation Infrastructure
Road Construction
Airport Pavements & Buildings
Railway Tracks & Stations
Automotive Test Tracks
Transportation Infrastructure
Road Construction
Airport Pavements & Buildings
Railway Tracks & Stations
Automotive Test Tracks
Tunnelling
Precast Factory
Australia & New Zealand
ABOUT US
Locations
Guiding Principles
Business Compliance
Management
1>2>3 Safety
Awards
COMPETENCE CENTRES
Competence Centres
teamconcept
Central Technical Division
BIM 5D® — Design, build and operate
LEAN.CONSTRUCTION
Technologies for the future (TPA)
BMTL — machines, equipment, material, logistics
PPP & BOT
CAREER