Southern Seawater Desalination Plant, Perth

Water / Wastewater Tunnels
Construction of two seawater intake tunnels and outfall tunnel using pipe jacking technology incl. supply of reinforced concrete pipes: 965 m of ID 2,000 mm, 1,720 m of ID 2,400 mm (2 x 860 m).