Australian STRABAG subsidiary Georgiou secures contracts worth € 190 million in mobility infrastructure and health care

18 Nov 2025
Georgiou has been appointed to construct a state-of-the-art medical facility in Claremont, Perth © ADC, Perth
© ADC, Perth

STRABAG SE, through its wholly owned Australian subsidiary Georgiou Group Pty Ltd, has announced two major project wins in Australia, reinforcing its strategic presence in both mobility infrastructure and healthcare construction.

Transforming one of Brisbane’s critical transport links


Georgiou, as part of the Gateway Connect Joint Venture (GCJV), has been awarded a share of the 568-million-euro-project Gateway to Bruce Highway Upgrade (G2BU) in Brisbane. Georgiou’s portion of the contract is valued at around 170 million euros.
 
Commissioned by the Queensland Department of Transport and Main Roads, the project will upgrade the key transport corridor linking the Gateway and Bruce Highways, enhancing road safety, traffic efficiency, and travel reliability. Key works include motorway widening, upgrades to interchanges and highway curves, a new local road access, and staged improvements to surrounding infrastructure. Shared pathways will encourage walking and cycling, while environmental measures including wildlife fencing and underpasses will protect local habitats and promote sustainability. Construction will span four years, with completion expected by mid-2030.

Delivering vital healthcare infrastructure in Perth

In a separate contract, Georgiou has been appointed by Australian Development Capital and project partner DermCo to construct a state-of-the-art medical facility in Claremont, Perth. The project worth 22.6 million euros is part of a broader development and will be fully delivered by Georgiou. It will feature spaces for a pharmacy, urgent care, pathology, dermatology, and other specialist practices.
With Western Australia’s population continuing to grow and age, demand for quality healthcare is rising fast. The state faces increasing pressure to expand and modernise its health infrastructure to keep pace with community needs, particularly in high-growth urban areas like Perth.
 
The 4,900 sqm medical facility to be built by Georgiou is designed to be 100% carbon neutral in operation. Construction is already underway and will continue through 2027. The project builds on Georgiou’s Health portfolio which includes current works at the Fiona Stanley Hospital Precinct and previous projects for Ramsay Healthcare, St John of God and the State Government Hospital sites.

  • Australia’s construction momentum is clearly accelerating, and we’re proud to be part of it. These two new projects showcase our ability to deliver excellence not only in large-scale mobility infrastructure but also in the healthcare sector – both vital to the Australian people. We’re excited to bring our expertise to communities across the country.

    Stefan Kratochwill
    CEO of STRABAG SE

For STRABAG, the partnership with Georgiou represents a strategic expansion into a stable and high-standard market, strengthening its international portfolio and long-term resilience, while highlighting the potential of this close collaboration in Australia.

Facts

STRABAG company
Georgiou Group Pty Ltd
Contract value
€ 170 million (of € 568 million) (G2BU)
€ 22.6 million (Claremont)
STRABAG share
100 % (30 % of JV) (G2BU)
100 % (Claremont)
Order backlog
Q4/2025 (G2BU + Claremont)
Segment
International + Special Divisions
Project schedules
10/25–mid-2030 (G2BU)
Late 2025–2027 (Claremont)
Clients
Queensland Department of Transport and Main Roads (G2BU)
Australian Development Capital/DermCo (Claremont)